Posted by: Diane | October 13, 2013

Getting ready to pour…

We are hoping to get the concrete floor poured this Friday if we don’t have weather that delays the concrete man.  Last week we got a few loads of sand and had them spread inside the forms Allen put up.  This weekend we are digging the trenches for the edge of the floor and where the PEX water pipe and an electrical conduit for the kitchen island go.

Everybody helps:

image

image

Micah digs while dicussing a video game with his friend, Hunter.

image

Digging a trench for PEX water pipe

image

Straightening the PEX

image

The trench inspector

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: